The Adriatic LNG terminal injected 8.2 billion m3 of natural gas into the grid in 2025, covering more than 13% of national gas demand.
Categories: Uncategorized
The Adriatic LNG terminal injected 8.2 billion m3 of natural gas into the grid in 2025, covering more than 13% of national gas demand.